Use a visit template to schedule one visit containing the activity types defined by that template. This article is for managers and assumes the visit template is already available.
NoteRequired role: Manager
Schedule a visit from a template
- Open Scheduler and select Plan visit.
- Drag a template from the Planning sidebar onto the required day.
- In New Visit, set the location, date, start time and end time.
- Choose the Assignees.
- Adjust the number of jobs for each activity under Jobs by Activity.
- Select Schedule.
Add a one-off job
You can add an ad-hoc job to a template-based visit unless the visit is set to repeat.
- In New Visit, select Add job.
- Select an activity.
- Select Choose location.
- Select Add job in the Ready to add card.
- Select Schedule.
Create recurring visits
Use recurring visits when the same template visit must be planned several times.
- In New Visit, switch on Create recurring visits.
- Set the Frequency to Daily, Weekly, Monthly or Yearly.
- Set Repeat every to a value from 1 to 12.
- Set Number of occurrences to a value from 2 to 100.
- Review the projected dates and job totals, then select Schedule.
Create recurring visits is not available when the visit was opened from a recommendation card. Recurring visits do not allow per-activity amounts or ad-hoc jobs. Each generated visit gets its job amounts from the Control Schema for its own date.
Important behaviour
- A template's activity list is fixed for that occurrence. You cannot remove an activity type, but you can reduce its jobs to zero.
- An activity type backed by a rotation plan cannot be reduced below the points selected by that plan.
- Setting an activity type to zero applies only to the current visit. The work remains due and receives no job in this visit.
- Templates store activity types, not job counts. The next visit starts with the count calculated by the Control Schema for its date.
- If pre-filled assignees do not have access to the selected location, they are removed. If Assignees is empty, select an assignee before scheduling; Schedule remains disabled until at least one is set.
- Dates that are already in the past are not created as part of a recurring series, so the series can contain fewer visits than requested.
Video walkthrough
1Scheduling a Visit from a Visit Template
2Understanding and Managing Visit Templates