Use this procedure to record system-level compliance data and confirm the assessment for a system during a Risk Assessment.
NoteRequired role: Inspector
Open a system in the assessment
- Open Locations.
- Open the location's Structures tab.
- On the structure card, open Risk Assessment and select the assessment.
- Under Things to do, open Systems.
- Select the system you want to assess.
Structures are not a separate data-collection phase in the assessment. From the assessment overview, you can also open the location's structures with View Structures in the header.
Enter and confirm the system data
- In General, enter the required System Name. Complete Operational Status and Description.
- Review the system's Linked Assets and Schematics.
- Complete Parameters, including the regime-specific readings for the system.
- In Assessment, select Satisfactory or Unsatisfactory to override the automatic result.
- Select Save. When every required field is filled, Save becomes Confirm assessment.
Important assessment behavior
- Under an enforcing Control Regime, the Satisfactory/Unsatisfactory toggle remains disabled until every required parameter has a saved, unexpired value. Complete and save the required parameters first.
- Selecting Satisfactory or Unsatisfactory manually overrides the automatic result. The calculated value is retained for the audit trail.
- Read-only users do not see the save button and cannot confirm the assessment.
- Marking a system Unsatisfactory does not by itself make its structure non-compliant. Structure compliance rolls up from its areas and assets, plus overdue jobs, open cases and open Technical Recommendations, including those on its systems.